Permits

Driveway Access Permits

Per Township Ordinances 1010-01 and 0605-01-  as updated at Regular Board Meeting on August 19, 2013 - Page Township requires new driveways and field accesses crossing township right-of-ways to be permitted before installation begins. 

The cost of the driveway permit includes installation of a swing-away mailbox support. All costs associated with construction of the access, including a culvert as required by the permit, are the responsibility of the landowner.